Maximo Monitor| Digital twinOHL-901 Performance view → - Monitor link -
Building the overhead line model…
Visual built procedurally from the Southwire Drake data (28.14 mm, 26/7) and the assumed span geometry; not manufacturer CAD. Span drawn 6× shorter along the line, conductors drawn thicker.
Conductor glow = conductor temperature
Cutaway: 7 m ground-clearance limit
Cutaway: 3 m vegetation envelope (L1)